Breaking Apart The Wishbone Intersection At Peace Street

Email readers: This blog post has image galleries. Read the post on the blog to see all the images.

The intersection of Peace, Wilmington, Halifax, and Salisbury.

Talks, visions, and plans for lots of places in downtown Raleigh exist if you know where to look. Solving problems like traffic congestion or providing new amenities for pedestrians and bicyclists are driving factors for new plans. The intersection on Peace Street with Wilmington, Salisbury, and Halifax Streets is being looked at and I thought it might be fun to go over some points that I see in the Peace Street Visioning Study, a sub-topic in the Capital Boulevard Corridor Study.

No plans are final and the report mainly discusses topics for future exploring. One highlight mentions:

The Wilmington/Halifax/Peace Street intersection represents a second opportunity to improve traffic flow and reduce congestion. A two-lane roundabout is recommended for feasibility analysis by the City transportation engineers. This intersection continues to be a bottleneck which may be improved with more conventional traffic engineering solutions. However, there is some prospect that a two lane extended roundabout might provide free-flowing traffic while establishing a signature open space at this important gateway into the state government center and downtown. The roundabout would extend south in to the Wilmington Salisbury loop, with the roadway geometry offset to the south.

Here’s a screenshot of a map of that section and what it might look like from a conceptual level.

Peace Street Visioning Study, intersection of Halifax, Wilmington, and Peace Streets.

Seems like Raleighites either love or hate these larger roundabouts. It will be interesting to see the analysis and if the plan has merit.

The civic space within the center of the roundabout has potential but I question whether pedestrians will use it. Could an active public space exist within a busy roundabout of this small size?

I’d like to see another plan for this area, one Raleigh has already had, and that is to return the streets to their original configuration. The wishbone piece of the intersection could be removed and Wilmington and Salisbury Streets can be straightened out up to Peace. A map of Raleigh in 1914 shows this configuration including Halifax Street making it’s way up to Union Square as it has always been before the state government complex was built. (yay, urban renewal?)

It’s possible that this idea takes a busy intersection and splits it into two smaller ones. Here’s a mock up in Google Maps of what it could look like.


View Peace/Salisbury/Wilmington Intersection Idea in a larger map

Current properties in the map, shown in blue, are the AIA NC building and a Department of Administration building. In orange, you can see the returned street extensions and the green covers the wishbone piece of the current intersection. I also highlighted two service entrances in purple that are needed for the government complex.

The new green space is wide open in terms of future uses. Possibilities for it are new mixed-use developments, completely open green space, or a balance of the two. If a civic plaza is desired, the complete road removals would allow for more space.

In terms of traffic flow, I’m also curious what would happen if Salisbury Street were changed to a two-way street. With it connecting directly into Seaboard Station Avenue, bicycles and vehicles would have a direct connection from the core downtown to Seaboard Station.

There is also a really great view looking north at Seaboard Station that anyone driving, pedaling, or walking on Salisbury would feel more welcomed to a different downtown district. If you notice on a map, Vaughn Court is the current “extension” of Salisbury Street. Here’s a view looking north from that street. Click for a larger view.

Seaboard Station entrance from Vaughn Court

I feel that this should become a “main entrance” to Seaboard Station in more of a way that it is today. With a two-way Salisbury Street, there could be better connections from Seaboard Station to downtown. You also get the visual bonus in that drivers and pedestrians can see their destination a few blocks away. Currently, you have trees and parts of the government center parking deck in front of you.

Looking North on Salisbury Street.

Wilmington Street already has a great view with the William Peace University main building front and center to traffic. An extension to the road could make the new intersection of Wilmington and Peace a more interesting place, brought about with any future developments that come from the Blount Street Commons project.

View of William Peace University down Wilmington Street.

With more development coming, an improved road network may make for more successful redevelopment in this area and who knows, maybe the government district could begin to grow some life during the off hours.

Click on the image below for a gallery of more images of the area.

View of the AIA NC building and William Peace University main building from Wilmington Street.

Municipography, Capital Boulevard and a Transit Tax

Municipography is a summary of current issues going through the Raleigh City Council and other municipal departments in the city. The point is to try to deliver any video, photos, and text associated with the discussions happening at City Hall or elsewhere. Since this is a downtown Raleigh blog, the focus is on the center of the city.

I recommend email readers click through to the website to see the embedded video.

This week, there was action at both the city and county level. Heated comments took place at the Wake County Commission meeting over a tax increase that would support expanded transit options in the county. Raleigh city staff presented the Capital Boulevard Corridor Study, a vision to remake the area from Peace Street all the way to I-440.

Capital Boulevard Corridor Study

City staff presented a general overview of the Capital Boulevard Corridor Study as well as some of the data gathered and citizen feedback. After some light conversation, the city council moved it to the Comprehensive Planning Committee for further review. An endorsement of the plan is needed before August to align with the NCDOT’s plans to design new bridges for Capital Boulevard at Peace Street and Wade Avenue.

Councilors briefly mentioned the topic of the at-grade intersection at Capital and Peace so I expect more conversation about it at the committee meeting. Still, city staff has added some excellent reading as an appendix to the corridor study and breaks down the metrics of measuring an intersection’s effectiveness. They explain the advantages and disadvantages of each interchange design including one type of at-grade proposal.

Wake County 1/2 Cent Sales Tax For Transit

On Monday:

In a 4-to-3 vote along party lines, members of the Wake County Commission Monday turned down a proposal to consider a transit plan and a half-cent sales tax referendum for this November’s ballot.

Commissioner Erv Portman presented the motion, at the very end of a meeting during which more than 20 people spoke in favor of putting the referendum on this November’s ballot.

Although Monday’s meeting agenda included no mention of the sales tax for an expanded transit plan in the Triangle, the topic dominated the public comment period.

Commission Votes Against Debate on Transit Sales Tax via Raleigh Public Record.

To hear/watch the public comment period, jump over to the Wake Board of Commissioners meeting agenda for June 18, 2012.

The needed 1/2 cent sales tax increase to secure a source of funding before transit in Wake County can be expanded has now been kicked down the road again. Durham County has approved it and is waiting for Orange and Wake Counties to do the same before they start collecting.

Orange County votes on the 1/2 cent sales tax increase this November.

Introducing Link Peace Street, A Resident Backed Alternative For Capital Boulevard and Peace Street

Peace Street with Capital Boulevard bridge

There’s a new project that’s growing some legs in downtown Raleigh. Link Peace Street is a vision from Raleigh residents for a more walkable environment on Peace Street. It coincides with the Capital Boulevard Corridor Study and hopes to put another alternative onto the table that is currently not being considered. I’m helping out with the effort and the core focus of it revolves around creating a plan for an at-grade intersection at Capital Boulevard and Peace Street.

Over the next few days, more information will be put onto the vision website of Link Peace Street so I encourage readers to check out the site we’ve built and sign up for updates.

Link Peace Street revolves around three main goals,

  1. Economic development in a form that fits into downtown Raleigh.
  2. Strengthen the connections between neighborhoods.
  3. Deliver on the 2030 Comprehensive Plan.

The Capital Boulevard Corridor Study, taking public comments at this time, targets private investment in the area using several projects. Some of those include an expanded greenway, a park at the old Devereux Meadow site, and multiple tweaks to Capital Boulevard itself. We’ve mentioned here before that the state of North Carolina is going to replace the bridge over Peace Street within a few years. The study wants to piggyback on that project and is considering some alternative routes to getting on and off of Peace Street. You can read about those alternatives on the Peace Street Vision document in the sidebar on the city’s website. These ideas are what planners think will help spur private investment in the area.

All plans being considered so far include the new NCDOT designed bridge and Link Peace Street wants them to consider the ‘no bridge’ option. We feel that the upgrades to Capital Boulevard, outlined in the study document, only promote more speed and will continue keeping vehicles moving through the area rather than stopping at a destination. Peace Street is the northern border of downtown Raleigh but most people don’t see it that way as the built landscape is not meant for a downtown at all. It’s possible that an environment that balances pedestrians, cyclists, and vehicles can promote development that is appropriate for downtown Raleigh and is a much better use of land.

With vehicles speeds kept the same and not increased, a walkable Peace Street will connect the neighborhoods rather than be an obstacle between them. In March, the Blount Street Commons project was asking the Raleigh City Council for a zoning change to allow for more density. At the same time, there is an apartment boom near Glenwood South. Both neighborhoods are so close yet feel much farther because of the uneasy walk down Peace Street in its current state.

It is a half mile walk from the Mellow Mushroom to Tyler’s Taproom yet so few people make that walk. In comparison, Fayetteville Street from one end to the other is a half mile. Peace Street may never have the towers and historic structures of Fayetteville Street but we think that we can atleast set up Peace Street for the same walkable experience. To have it, it starts with people and not vehicles.

The 2030 comprehensive plan specifies that this area is in the Core Business District category. It states:

This category applies to the Raleigh Central Business District, and is intended to enhance Downtown Raleigh as a vibrant mixed use urban center. The category recognizes the area’s role as the heart of the city, supporting a mix of high-intensity office, retail, housing, government, institutional, visitor-serving, cultural, and entertainment uses. Multiple zoning districts apply within the CBD, corresponding to the different character and vision for its various neighborhoods. The maximum residential density in this area would be 320 units per acre with densities tapering off towards edge areas adjacent to established residential neighborhoods, but not falling below 40 units per acre.

The Capital Boulevard study wants to widen lanes and help the flow of traffic. This does not fit with the description above and Link Peace Street feels that goes against the plan adopted just a few years ago.

How can we continue to do what we’ve been doing here in the corridor and expect different results?

Insanity: doing the same thing over and over again and expecting different results.

-Albert Einstein

We’re hoping to build support for the idea before the study is brought to the city council before the May 1st meeting.

Municipography, Walking, Union Station, and Commuter Trains

Municipography is a summary of current issues going through the Raleigh City Council and other municipal departments in the city. The point is to try to deliver any video, photos, and text associated with the discussions happening at City Hall or elsewhere. Since this is a downtown Raleigh blog, the focus is on the center of the city.

Walk Raleigh

Matt Tomasulo and his Walk Raleigh signs have been accepted as a gift to the city. The signs brought international attention to Raleigh and after some time had to be taken down because of the lack of a permit. Still, the signs made their statement and some will be put back up for a 90 day pilot program.

The council unanimously approved.

Union Station Financials

Last month, city staff was authorized to apply for a Transportation Investment Generating Economic
Recovery (“TIGER”) grant for a component of Union Station. The NCDOT and Triangle Transit are helping with the application too and have come up with this financial breakdown:

  • Station development: 80% federal, 10% state, 10% city
  • Rail/track/platform improvements: 80% federal, 20% state
  • Street improvements: 80% federal, 20% city

This puts the city’s cost at $7 million. Remember, that last year $3 million was approved by voters in the Transportation Bond. So the remaining $4 million will have to be worked into next year’s budget cycle. This move helps the grant application.

John Odom voted against this stating concerns about the cost while the rest of the council approved.

Commuter Rail Station Locations

The city’s Passenger Rail Task Force stopped by to endorse the locations of the commuter rail stations in Raleigh. Those four being at:

  • Southeast Raleigh at Hammond and Rush Streets
  • Downtown Raleigh at the Warehouse District
  • NC State near Dan Allen Drive
  • West Raleigh near Corporate Center Drive

You can read about more about this as well as light rail and buses at the Transit tag link but for the best wrap up of the commuter rail plans jump to, “Transit, Commuter Rail, and More, We Dive Into The Docs.”

The council approved this unanimously.

Updated Unified Development Ordinance Now Available

Another draft of the city’s Unified Development Ordinance (UDO) is now out for public comment. I’ll admit, this is a tough one for citizens to swallow so perhaps after some time, there will be some highlights about it. For now, I’ll try to inspire readers to dive into the documents over at the city’s webpage for the UDO.

If you have time, please watch this video, embedded above, from the city’s Youtube channel that talks about the new code and can maybe clear this up for more people, even if just a little.

Municipography, Union Station and Downtown Property Loans

Municipography is a summary of current issues going through the Raleigh City Council and other municipal departments in the city. The point is to try to deliver any video, photos, and text associated with the discussions happening at City Hall or elsewhere. Since this is a downtown Raleigh blog, the focus is on the center of the city.

The first Raleigh City Council meeting of 2012 was held yesterday. The proposed Union Station was discussed and the agenda describes it just as well as I can. From the January 3, 2012 agenda packet:

F. REPORT AND RECOMMENDATION OF THE PASSENGER RAIL TASK FORCE

1. NCDOT Concept for Raleigh Rail Station

At their December 12, 2011 meeting, the Passenger Rail Task Force discussed proposed improvements to the Dillon Viaduct Building by NCDOT to convert the facility to a passenger rail station. The new station would replace the existing train station on West Cabarrus Street and would accommodate existing Amtrak service, proposed future high-speed rail service, and the proposed future Triangle Transit commuter rail service. The passenger rail station would be the first phase of a larger Union Station multimodal facility that would also provide service to local bus, regional bus, and light rail services. City staff will continue to work on conceptual designs for future phases of the Union Station multimodal facility.

After reviewing draft concept plans presented by the NCDOT Rail Division, the Task Force voted unanimously to recommend endorsing the proposed Viaduct Building rail station retrofit concept. A complete copy of their evaluation is included in the agenda packet. $3 million has been appropriated for City participation in the cost of this facility
as part of the 2011 Transportation Bond and will be available in FY13 in the draft Capital Improvement Program.

Recommendation: Endorse the findings of the Passenger Rail Task Force to retrofit the
Dillon Viaduct Building for use as the rail station of Union Station.

The council voted unanimously to endorse this site and the plans recommended by the Passenger Rail Task Force. Watch the video below for more discussion about it during the meeting.

A great pdf document that goes over the concept of turning the Dillon Viaduct building into a train station is “NCDOT Viaduct Building Assessment”, taken from the Passenger Rail Task Force webpage on the city’s website. You can download it here. In this document, you can see the phased approach to adding new platforms for Amtrak, commuter rail, and high-speed rail to the Boylan Wye as well as other additions to accommodate the station.

Downtown Loan Program

The Downtown Loan Program was created for properties along Fayetteville Street, typically older structures, to be brought up to proper code for owners and potential tenants. This was an effort to help bring businesses to the Fayetteville Street area after it’s renovation a few years ago. The loan program is now being expanded to more streets in downtown Raleigh. From the City of Raleigh’s press release, the streets include:

The program will include portions of Dawson Street, Glenwood Avenue, Hargett Street, Martin Street, Davie Street, Fayetteville Street, Blount Street, Person Street and designated at primary retail Street in the Comprehensive Plan. Designated secondary retail streets include portions of Harrington Street, West Street, McDowell Street, Dawson Street, Salisbury Street, Wilmington Street, West Morgan Street, Hillsborough Street and Peace Street.

And finally more about the program:

The program is designed to create an incentive to new and/or expanding Downtown businesses and commercial property owners seeking to improve properties. To be eligible for the loan program commercial property owners and business owners must demonstrate management ability and experience. Qualified applicants must show they are unable to secure financing from financial institutions for the amount being requested from this program. To date the program has made three loans to area businesses. One of the loans has been fully repaid. Currently $200,000 is available.

The expansion was approved by the council during the consent agenda.

Downtown Raleigh 2011 In Review

Tubes of Light by dtraleigh, on Flickr

2011, what will we remember you by? All-star weekend or Hopscotch 2? Could the food truck saga of this year be the one that sticks out in your mind? Or perhaps, if affected, you may still be dealing with damage from the April tornadoes?

On planning downtown Raleigh, this past year has been pretty active with long range plans becoming more detailed, less alternatives, and more decisions. Missing was another Raleigh Wide Open but there were plenty of events that kept spirits high. One of the biggest feather in downtown’s hosting cap was the 2011 NHL All-Star game, bringing a new format from years past and was reviewed very positively across the hockey world.

As always let’s first start with the 2011 wishlist. This list only consists of items that can be done in one year’s time.

  • Bookstore
  • More Hours
  • Counter Service Food
  • Food Markets
  • Mass Transit Plan

For a second year in a row, a bookstore has not happened. Reading articles about Amazon selling a million Kindles a week this holiday season really isn’t helping new bookstores open especially an independent store in a relatively low traffic, downtown area. Probably the best thing is for downtown residents and workers to support the Wake County express library on Fayetteville Street. The library is open Monday to Friday from 10am to 6pm so if you can work it into your schedule, give this location a shot.

I feel some businesses have tried to expand their operating hours this year. I didn’t keep track of this one very well so correct me if I’m wrong. A few examples that I can think of are The Pit opening on Sundays, Wilmoore Cafe having weekend hours, Poole’s Diner opening on Tuesday nights, and Mecca adding some hours as well. The wish really is to get to the point where downtown Raleigh is “open for business” at all times of the day and night so that people feel there are several options available to them. This pushes the 24/7 idea closer to reality.

Counter service food options are still out on the horizon. Chuck’s attempted counter service but later changed it due to requests. Perhaps more residents in the area will help expand the quick and cheap eats category options.

The downtown Farmer’s Market continued to serve up City Plaza each Wednesday this year during the warmer months, just like the last one. This is probably the closest thing to market style food buying that we’re going to get for awhile. There is however a produce shop over in City Market that a lot of people don’t know about. Walk over there and give them a try if you are into Farmer’s Markets.

There was plenty of transit talk this year and plans are taking steps forward. In light-rail news, the city picked their preferred alternative which involves a light-rail line to enter downtown from the west on Morgan Street and hang a left on to Harrington Street to exit downtown to the north. A comprehensive bus plan has also been released with plans to significantly expand bus service around Raleigh and the rest of the Triangle. High-speed rail is also moving along with a new plan to bridge the trains over Capital Boulevard into Glenwood South as they head for Union Station in the warehouse district.

Construction in 2011

New building construction moved along in 2011 with projects continuing to take shape or break ground. Here is a list of construction projects we’ve been following all year.

  • The American Institute of Architects North Carolina building on Peace Street has finished, or is close to finishing, up now as we close out the year.
  • The Wake County Justice Center started the year as a formation of steel beams in the ground. The construction project will go into 2012, topped off and mostly covered up. County officials have also let everyone know that this project came in under budget.
  • The Green Square project has partially finished with the rest set to open in April 2012. The Department of Environment and Natural Resources offices are fully open as well as the parking deck across the street. The Nature Research Center, with it’s eye catching globe at the corner of Salisbury and Jones Street, will open in 2012.
  • Glenwood South’s first hotel, a Hampton Inn, has broken ground at the corner of Glenwood Avenue and Johnson Street.
  • The North Carolina State Bar has started construction on their new headquarters at the corner of Edenton and Blount Street.
  • All year we’ve watched the State Employees Credit Union building on Salisbury Street rise up and peak at about twelve floors. Glass is being installed on the building now and construction will continue into 2012.

Go here for a gallery of renderings of SECU and Green Square.

Other highlights of 2011:

  • Numerous electric vehicle chargers have been installed around the city with several in close proximity in downtown.
  • A large scale development project, The Edison, has scaled down tremendously.
  • The still empty lot where The L Building is planned now contains attractive banners to cover up the gray wall of the parking deck.