New Upfit Activities in the Moore Square Historic District

Rendering for new storefront at 211 South Wilmington

Rendering for new storefront at 211 South Wilmington

There’s work taking place in the Moore Square Historic District that may see new life in older buildings.

Currently under review by the Raleigh Historic Development Commission is a new storefront for 211 South Wilmington. The building will be upfit with a new storefront that aims to maintain the scale of the district but with modern character. The plans, 128-17-CA, mention a two-story noodle bar for this space.

With the building being in a historic district yet featuring no major architectural features (from my unskilled eye anyway) I can’t see any major controversy here.

For reference, here are the row of buildings today.

211 South Wilmington, September 2017

211 South Wilmington, September 2017

It’s a shame that 211 South Wilmington didn’t maintain its facade from the 1960s. The story of this building and the tenants that have cycled through would make a great follow-up.

211 South Wilmington, early 1960s

Around the corner at 107 East Martin, could something finally be moving in? This spot has been an empty shell since Raleigh Printing closed. (moved?) If anyone can remember when that happened, let me know but I want to say it was at least 10 years ago.

107 East Martin Street, September 2017

I’m happy to see some of the older buildings getting new life as these add diversity to our urban environment and play a huge role in keeping downtown more interesting.

The Apartment Mid-rise Boom is Fading in Downtown Raleigh

The Dillon Apartments on Hargett Street

It hit me recently during a conversation in a downtown coffee shop that The Metropolitan apartments would have seen residents moving in this month. If you don’t know the history, the project, while under construction, met an unfortunate fate and went up in flames in March of this year.

The developers plan to rebuild and the site is currently being cleared.

If it wasn’t for the fire delaying the delivery of The Metropolitan, we could easily see the end to the multi-unit, mid-rise apartment product line in downtown Raleigh. At least for the foreseeable future.

Site of The Metropolitan Apartments fire site.

Site of The Metropolitan Apartments fire site

Barring any new project announcements, the apartment pipeline would have ended with The Dillon opening in 2018. Taking a look at the latest list of projects released by the Downtown Raleigh Alliance, we can see that there are no planned projects similar to these.

To be clear, I’m referring to the 5-7 story, wood-construction buildings with a larger footprint. Typically to make these work, developers have had to acquire multiple properties and combine them.

That’s not to say the residential projects aren’t flowing. The product is just changing.

Smokey Hollow plans to bring 445 residential units in a 12-story building on Peace Street. FNB Tower will mix up office and 247 residential units across 22 stories. 400H will also mix office and 220 units in a 20-story building. Details are still light on 301 Hillsborough but with a similar style to the other projects there’s no reason to guess that more residential units could be included.

That’s 900 units across three projects right there.

Rendering of 400H

Most recent rendering of 400H

The other side of the picture is the rise in townhome projects. These are adding infill to the periphery of downtown. Currently under construction, we have:

  • The Saint – 17 units
  • Hargett Place – 19 units
  • 10 Arros – 10 units
  • West + Lenoir – 12 units
  • 611 West South – 42 units
  • The Ware – 15 units

115 townhomes are in the works and more are in the planning stages.

Perhaps we’re at a point where combining multiple parcels for large footprint developments isn’t economically feasible for mid-rise buildings. There could be other changes in the market that are affecting this. Downtown could also be much more livable than before, enticing buyers to purchase units than rent.

Maybe there is a hold on projects as plans for a downtown soccer stadium and big infrastructure changes to Capital Boulevard need to pan out for developers to pitch new projects.

You could look at it from a lot of angles. It’s certainly a great topic to discuss.

Checking in on The Saint townhomes

Construction underway at The Saint

Construction underway at The Saint

Construction for 17 new townhomes is underway along St. Mary’s Street between Jones and Lane Street. Called The Saint, these units are being billed as luxury with price tags on the higher end of the spectrum for downtown Raleigh townhomes.

A quick visit to the location recently shows the foundation work has begun and you can get a glimpse of the new alley-street that will cut from Jones to Lane to access the units.

With all high-end products comes high-end aerial video which I’ve embedded below for your enjoyment. (the views are nice, click here if you don’t see the video)

You can find out more about The Saint at their website.

Change in Design for City Gateway

Rendering of City Gateway

Click for larger

City Gateway, the 10-story, energy-positive building planned for Kindley Street, is going through a bit of a design change. Peaking at the submitted Administrative Alternate for Design (AAD-24-17) on the city’s website, we can see some newer renderings for the building.

The change in materials and setback can be seen in these renderings compared to ones submitted back earlier in 2017.

Rendering of City Gateway

Click for larger

The AAD hints at City Gateway being part of a “phased development” along Kindley Street with “a future extension to MLK Jr. Blvd.” Kindley to MLK, I can’t quite see it. Perhaps a connection to the northbound on-ramp but I think the elevation difference presents a challenge.

We’ll see how that one turns out but speculate for yourself on Google Maps.

Back to the building, it’ll definitely be something unique and the expanded office space is always welcome.

Rendering of City Gateway

Pic of the Week

Residence Inn in downtown Raleigh

The Residence Inn is now complete and open for business. While the new hotel’s grand opening should be next month, it won’t stop anyone from booking a room today.

The ground-floor restaurant is still a work-in-progress and the retail space at the corner of Lenoir and Salisbury Street is looking for a tenant. However, the rooftop bar, named Tenth and Terrace, is open with some pretty nice south and southeasterly views.

Pic of the Week

Construction site of Boylan Flats on Boylan Avenue

Dirt is moving at the site of Boylan Flats, the five-story, 48-unit residential building along Boylan Avenue. (615 N Boylan) From what I’ve seen out there, this development is quieter than most with no released real estate info at this point in time. (and no approval drama either)

It’ll be interesting to see the layout of the building as this five-story building sits on a 0.23 acre site. Nearby, a developer wants to put a five-story boutique hotel on a 0.36 acre site which could fit nicely given that hotels have a two-to-one hotel room to parking ratio requirement.

Five stories may not sound so bad in this area of town.