Construction of Peace Street Townes continues. A sign at the site claims, as of last weekend, that only 4 units remain of the 18 unit site.
Category / New Construction
Steel Rising at Holy Trinity Anglican on Peace Street
I’m trying to think when the last new church was built in downtown Raleigh? There may be quite a gap between that one and the one being constructed now on Peace Street next to the AIA NC building.
Holy Trinity Anglican is currently located at the house on the corner of Peace and Blount Street next to the church construction site. The building should be finished by September 2015. There’s a nice virtual tour video, embedded below, or on Vimeo. I wish other new developments would release videos like these.
Take the Tour from David Cumbie on Vimeo.
Newest Rendering of the Edison Office
Saw this on Twitter. This project is increasing in height it looks like.
The Edison Office in #DowntownRaleigh for @BeaconCLT pic.twitter.com/AT7A8c2F4A
— JDavis Architects (@JDavisArchitect) August 28, 2014
Updated Renderings, Plans For New Convention Center Hotel
Last week, the Raleigh Appearance Commission got a look at some new renderings for a hotel planned for the parcel of land near 500 Salisbury Street next to the convention center between Lenoir and South Streets. Long-time readers might remember this site being called “Site 4” and it looks like the renderings are getting more mature now.
Some of the specs for the hotel, planned to be a Residence Inn, have slightly changed also. Comparing to a January 2014 post, we have:
- 6,455 square feet of retail/restaurant space compared to 7,085 sq. ft. previously.
- 9 stories instead of 11
Most is the same including the second floor and rooftop terrace.
As mentioned in past posts, this project will not add any more parking as a deal has been made between the developer and the city to lease spaces out of the Performing Arts Deck.
The project has a good human scale to it and expands downtown’s hotel offerings. I think this project is an easy one to support. While not architecturally significant, it’s more a functional addition rather than an iconic one. Looking forward to groundbreaking.
Pic of the Week
The Charter Square construction site seen from City Plaza. This is the first tower of the two-tower project.
Pic of the Week
Corner of Wilmington and Davie Streets, future site of The Edison Apartments. The two-story brick buildings have been removed and the site is cleared for new construction.
Here’s a photo of the same corner in 2008.
Pic of the Week
Concrete and steel is rising at the Charter Square site.
Square Loop is Approved at Capital Boulevard and Peace Street
Capital Boulevard bridge over Peace Street
Just a quick one today. At yesterday’s Raleigh City Council meeting, approval was given for the NCDOT recommended P5 alternative, also known as “the square loop.” We’ve gone over this plan for that area before so I’ll recommend you jump to a November 2013 post.
I feel the P5 alternative slows traffic down and starts to transition the area towards one with better urban form. I’m a huge fan of a grid-like street network and this alternative creates that in the new connection at Johnson Street and the Harrington Street extension. If we can add in on-street parking along these areas, interest in new development could increase. It can’t get any lower as the area only consists of sprawl-like, one-story buildings with surface parking.
*New Capital Boulevard Designs Out, Status Quo versus New Connections
Up next is the environmental study which is planned to be complete by this Fall. Construction is planned to start in the Summer of 2015.
You can dive into the official project page at the NCDOT: Peace St./Wade Ave. Bridge Replacements on Capital Blvd. page.