My Thoughts on the R-Line

An R-Line bus in front of the Raleigh Convention Center

One of downtown Raleigh’s hot topics this year has apparently been the R-Line. If you’ve been following, there are a slew of stories about the perceived unfairness of the fare-free bus circulator that operates seven days a week. With upcoming fare increases on other routes of the Capital Area Transit (CAT) system, the R-Line is being looked down upon by certain Raleigh individuals.

My take on this is that the R-Line is being politically micro-managed and we should let the transit planners have a say.

Background articles to read:

The route was first introduced in February of 2009 with a dedication ceremony in front of the Raleigh Convention Center. It’s important to note that the R-Line was one piece of a much larger puzzle. The Convention Center had just opened around that time. The Fayetteville Street makeover was still pretty fresh. City Plaza was less than a year old.

These were downtown improvements made to attract more visitors, create more spending, and create more businesses. From a city point of view, that means paying back the investment in downtown and generating more tax revenue. Cities do this to sustain a high-quality of life, which Raleigh has, with a fair or low cost of living.

A lot has happened over the last five years though.

Events have been one of the largest driving forces behind downtown Raleigh’s growth. Fayetteville Street events used to close off one or two blocks. Moore Square events could be contained within the park itself.

Today, downtown is bursting with events.

An interesting statistic would be the growth of attendance and size over the years. I would put money down that that number has increased year after year.

You have a pretty good chance of catching an event on Fayetteville Street on any given weekend these days. From mid-August to mid-October, downtown is crawling with events and people. Spring has another spike in events that seem to take over. Parking decks are as or more full on weekend nights as they are during the workweek hours any weekend of the year.

It also seems that every marathon that comes to town wants to run their route through downtown Raleigh. We’re not talking just a few, but several dozen closing streets on random weekends.

So what does the R-Line have to do with downtown being the host with most?

A strategy (the R-Line) to make our public investments (Convention Center) more attractive became hugely successful and everyone wants to get a piece of it.

And why was it successful? In my opinion, the R-Line is run like most bus routes should be run. No timetables and a higher frequency of buses passing by.

It was also the first city bus route, to my knowledge, in Raleigh to have GPS tracking. Those with smartphones could see the bus location before heading out to the bus stop. With all the amenities and ease of use, it was implemented very well and has become successful.

Over the years, Raleighites have adopted it. The original purpose is still intact, with the buses moving conventioneers around downtown. The event-driven downtown has used it for moving people between venues. The growing resident population has used it to travel between districts. With a stop near the Moore Square Transit Center, CAT riders have also used it as either the first or last leg of their trip when getting around.

With a diversity of riders, sounds like a success story to me.

Today, the R-Line’s fareless system is being picked on. With an upcoming 50-cent increase in fares over the next 2 years on every other CAT route, there are some vocal citizen advocates that think this unfair, with one individual quoted in an N&O article calling the R-Line racist.

Opinions and proposals on the R-Line aren’t hard to find either.

The articles linked above mention issues such as fairness, equity, and cost. Expanding the route would cost more. How can you make the R-Line more fair? Should all riders have equal access and the demographics of riders be diverse?

We’ve definitely lost sight of the original purpose of the service, which is to move visitors (from hotels and the convention center) around downtown.

An R-Line bus passing through Glenwood South

What we have today though is a situation where the R-Line is so successful that groups want to either copy the R-Line model or modify the current route to include their neighborhood or business, with complete disregard to the overall system that the R-Line is a part of.

In 2013, the Midtown Raleigh Alliance teased an idea of an M-Line between North Hills and Downtown Raleigh. I wrote about the idea and how it compared to the currently in place Route 8 – Northclift CAT route. They seem similar.

In 2011 and back again this year, Cameron Village and nearby residents are petitioning to change the R-Line route to serve the shopping center and the neighborhoods around it. I wrote about it back in 2011, and it’s pretty applicable this year too, that Route 12 – Method and Route 16 – Oberlin both have been providing a link to and from Cameron Village for years.

You also have residents in Oakwood and Mordecai that think the R-Line should swing more north to serve the growing Person Street District. In the linked articles, there are opinions that the R-Line should go more east instead of turning around Moore Square only. CAT routes serve those communities today.

Finally, I’ve heard that the upcoming 10-year Downtown Plan has a pretty healthy section on the R-Line. The draft release of that is scheduled for September 11, blog post on that soon.

It seems the R-Line has now become politically infested. It works so well that others are upset that it isn’t serving their communities. I predict any outright support for the R-Line would be seen as a politically bad move at this point.

I wrote this in the 2011 post about the R-Line going to Cameron Village:

“In my opinion, the petition just shows this area’s readiness for an upgrade in transit “

Raleigh, you are ready to level up. It is time to put on your big girl pants and commit to moving CAT to the next level.

Raleighites should stop picking on the R-Line and start getting behind seeing more money in the budget for the CAT system. Raleigh should hire some top transit talent to guide us in moving to the next level.

With a cohesive and easy to use transit system, funded by all Raleighites, priced fairly for the service it provides, we will stay on the top 10 lists for decades to come.

Municipography, Moore Square Transit Station, Smartphone Apps, and Smart Cards

Municipography is a summary of current issues going through the Raleigh City Council and other municipal departments in the city. The point is to try to deliver any video, photos, and text associated with the discussions happening at City Hall or elsewhere. Since this is a downtown Raleigh blog, the focus is on the center of the city.

There was a lot of transit talk at this week’s city council meeting. Presented to council were some 3D renderings of what the future Moore Square Bus Station could look like after its upcoming upgrade. Technology upgrades in downtown transit are also coming as money has shown up towards setting up a downtown Raleigh smartphone application and a smart card fare system for the CAT buses.

Moore Square Transit Station


Watch the video snippet above. If it doesn’t work for you, go here.

As part of the ongoing Downtown Bus Facilities Master Plan, Moore Square Transit Station is getting an upgrade. Jason Horne of the Raleigh Transit Authority and
the design team presented some new renderings of the station’s future. Construction could start as early as Spring 2015 on the now 26-year-old facility. Plans call for a new bathroom, security and ticketing office, more open, friendlier spaces, and and an additional lane for buses to handle more capacity.

Construction is estimated to take 14-18 months with the station being open throughout that time period. Here are a few slides from the presentation. Make sure to read the Raleigh Public Record’s article about the presentation and to see the rest of the slides and renderings.

Plans for the future Moore Square Transit Station

Plans for the future Moore Square Transit Station

Plans for the future Moore Square Transit Station

Downtown Smartphone App


Watch the video snippet above. If it doesn’t work for you, go here.

We definitely talk about parking a lot here. However, an initiative that I’m involved with to bring a smartphone app to downtown in order to help with any parking struggles has moved one step further. During the meeting, council approved $5,000 from a contingency fund to go towards the development of that app. The Downtown Raleigh Alliance will raise the rest of the money and see the app to completion.

Read more about our efforts here:

It’s never a bad time to talk about everyone’s favorite topic: Parking. I typically don’t fly the blog outside of downtown Raleigh but North Hills has something that’s very unique. I’m excited to announce that the Parking App Team that won last year’s DataPalooza, with roots in downtown Raleigh, has launched in North Hills.

*North Hills Smartphone App Will Include Parking Directions, Rumored World Peace

My team’s idea? To help people navigate urban areas, showing them the best possible parking locations and offering wayfinding to their end destination. Our smartphone application, still in the prototype phase, is the first step in implementing this process. We also have a nice list of features that will make the application very helpful.

*Parking In Downtown Raleigh May Get Easier Thanks To Open Data

Smart Cards for CAT Buses
As a final blurb that I think is worth mentioning, the city has received grant money from NCDOT to go towards a smart card fare system for CAT buses. Mentioned at the meeting, here’s an excerpt from the press release:

The Raleigh Transit Authority has adopted a priority of offering smartcard technology on CAT buses. The grant will allow a contactless, smartcard payment option to be installed on the fare boxes of the CAT bus fleet. Bus purchases will have fare boxes that will accommodate contactless smartcard and mobile ticketing applications. The total funding for the project is $378,440 90, which is 90 percent NCDOT grant funds and 10 percent City of Raleigh funds.

*City Receives Grant to Allow Smartcard Payment on Capital Area Transit Buses

Yay! Technology!

Sharing Bikes, It’s What Raleighites Do

San Antonio B Cycle Station

San Antonio B Cycle Station

Or will do anyway according to a recent report. I just went through most of the recently released 2014 Raleigh Bike Share Feasibility Study. The conclusion of the study finds that a bike share system in Raleigh is feasible. You can get the study here (pdf) or see it and a lot of other Bike Raleigh information at BikeRaleigh.org.

I decided to go through the study and take some notes.

Executive Summary
If anything, the Executive Summary is worth reading through. At a high level, the study identifies the following benefits of a bike share system for Raleigh:

  • “Augmenting the City’s existing transportation options while encouraging active transportation by lowering barriers to entry for minority and low income residents.”
  • “Providing an impetus for further investment in bicycle-friendly facilities.”
  • “Building on the City’s reputation as a forward-thinking, bicycle-friendly community.”
  • “Using bike share to promote the City to potential employers, residents, and visitors.”

These findings were based on certain qualities that our city has. This includes a comparatively “high resident density” and “high concentration of employers” near downtown, a “significant tourist market,” and “plans and policies in place focusing on the promotion of livable, walkable, and bicycle friendly places.”

A bike share system in Raleigh is not without its challenges however. Two major obstacles identified are:

  1. “A high dependency on single-occupancy vehicles (SOV’s)”
  2. “an emerging but not yet complete network of bicycle-friendly facilities”

Also mentioned as obstacles are a “difficult topography” and “existing development patterns” that promote low population and employment densities outside of downtown.

The first round of cost estimates are mentioned as well. From the report, here’s a table showing approximate startup and operating costs based on national averages.

2014 Raleigh Bike Share Feasibility Study - Projected Implementation Costs

Diving Into The Study
The study is divided into nine sections that start by introducing bike share, what it is and how it has been implemented in other cities, all the way to demand analysis in Raleigh and a final recommendation.

If you are asking yourself, “What is Bike Share?” then I recommend reading pages 4-11 for some background history and fun facts about the service. For example, did you know:

A bike share system can help a community attract and retain residents. Many communities have used bike share systems as an added effort to help (re)vitalize and reactivate their downtown area(s). In addition, it provides a new and different way for tourists to see a city, helping attract more tourists and their spending power to communities.

*2014 Raleigh Bike Share Feasibility Study – Community Economic Benefits page 8

I won’t go over the basics and benefits of a bike share system in this post. Instead, I’ll recommend checking out the study or reading a June 2013 blog post about my visit to San Antonio and using their bike share system.

Community Analysis
The study starts by taking a look at Raleigh and some of the community features like demographics, physical makeup, and current infrastructure.

Our temperate weather is always listed as a plus. Another plus are some generally flat areas around the core downtown. That’s not to say there aren’t some hills out there. I know Glenwood South is on quite a slant when cycling up and down it.

Our population:

The City of Raleigh is the second most populous city in the state with approximately 423,000 people living in the city – a density of around 2,800 people per square mile, which is higher than all of the other southeastern bike share cities.

*2014 Raleigh Bike Share Feasibility Study – Demographics page 26

That’s a pretty powerful statistic right there. Here is the comparison between us and other southeastern bike share cities.
2014 Raleigh Bike Share Feasibility Study - Size, Population, and Density Comparison

The study shows that the population and employment density is most clustered in and around downtown. There are a few pockets of higher density residential in southwest and north Raleigh but downtown really commands the most attention. See the figure below for a heat map of population density in Raleigh.

2014 Raleigh Bike Share Feasibility Study - Population Density
Click for larger

Analysis was also done on low-income and minority communities. There is a significant overlap between feasible areas for bike share and locations of these communities. This presents an opportunity to provide a low-cost transit option to these residents.

Compliment to Transit?
Here’s probably the biggest challenge and detractor to the feasibility of a bike share system in Raleigh.

Raleigh is still a predominately auto-oriented city – single occupancy vehicle use represents 79-percent of all commuting trips (See Figure 21).98 Parking costs have traditionally also encouraged vehicle travel, even for short trips.

*2014 Raleigh Bike Share Feasibility Study – Transportation Mode Share page 32

2014 Raleigh Bike Share Feasibility Study - Transportation Mode Share

The quote says 79% while the pie chart shows 84%. Unless I’m missing something that might be a typo in the study. Either way, both numbers are pretty high and significantly show Raleigh’s dependency on SOVs.

The only area in the city with a significant amount of proximity to transit, mass transit specifically like Capital Area Transit (CAT), is in downtown. The study points this out as a challenge but lists an opportunity to use bike share to bridge gaps between activity centers that are poorly served by buses.

I think this is the biggest challenge by far for a successful implementation of bike share in Raleigh.

In addition to bus transit, our current bicycle facilities are mentioned. The study recognizes the increase in facilities over the last four years and the city’s commitment to be a “bicycle friendly community.”

However, if you look at the overlap between the areas where bike share is feasible, mainly downtown, and the fact that bike facilities are spread across the city, this leaves much fewer miles to be used within a possible system.

Here’s a point for more discussion. Most bike facilities are actually outside of downtown so to say that bike share can only happen near bike facilities doesn’t quite tell the whole story in my opinion. Downtown streets are naturally friendlier to bicycles so therefore are more fit for bike share. The study points out that there are much less bicycle facilities in downtown as a detriment to a bike share system and I think that could be argued against.

Policy
I’m not going to get into the details of this section but wanted to mention it as I thought it interesting. An identified challenge was that “The permitting process may be complicated due to restrictions on outdoor advertising, historic district designation, right-of-way ownership by multiple government agencies, and specific streetscape plans.”

Complicated indeed. An included flow-chart shows some situations having to go through seven layers of permitting.

Public Engagement
The feasibility study was not without its opportunity for you and I to participate. “Public feedback was gathered using a number of tools including a community workshop, a project website, an online survey, a crowdsourcing map, and interviews with local stakeholders and agencies.”

Surveys showed that 84% of respondents support a bike share program in Raleigh. Opinions, both supportive and of concern, were around the themes of:

  • “Promoting bicycling as a viable transportation option in Raleigh.”
  • “Helping to reduce traffic congestion.”
  • “Helping to make Raleigh an “attractive” city for new residents.”
  • “Concern for the cost of the system.”
  • “Needing a more extensive bicycle network prior to implementation.”

To gather more information, an online crowdsourcing map was built so that people could suggest station locations and provide comments. Here’s a map of the 151 stations that were received including a table of the top 10.

2014 Raleigh Bike Share Feasibility Study - Publicly Suggested Station Locations
Click for larger

Big Picture Conclusion
The study goes on to explain its methodology behind the recommendations and results as well differences between the types of bike share systems that are out there. Below is a potential bike share heat map as well as a list with final conclusions and recommendations.

2014 Raleigh Bike Share Feasibility Study - Potential Bikeshare Demand Heat map
Click for larger

  • Geography, Climate and Land Use – “Challenges do not outweigh the opportunities.”
  • Demographics and Employment – “Although there are large areas of the City with low population and employment densities, the constant influx of large employers and residents to downtown provide a strong opportunity for successful implementation of a bike share program in the area.”
  • Transportation Mode Share – “Coordination of deployment of stations with existing and planned public transportation services will be important to help extend the reach of service and connectivity to and from activity centers.”
  • Bicycle Infrastructure – “City should continue to develop its planned network of bicycle facilities and a complete way-finding program in parallel with a potential implementation of a bike share program.”
  • Tourism – “City should consider allocating some funding for specialized outreach for tourist oriented promotion of the bike share program.”
  • Local and Regional Plans and Policies – “It is recommended that the City review and consider amending local regulations related to signage to allow for the placement of sponsorship and/or advertising on bike share stations to potentially help cover costs for program.”
  • Public Input and Stakeholder Engagement – “There is general support for implementing a bike share program in the City of Raleigh. Station based system is preferred.”

North Hills Smartphone App Will Include Parking Directions, Rumored World Peace

It’s never a bad time to talk about everyone’s favorite topic: Parking. I typically don’t fly the blog outside of downtown Raleigh but North Hills has something that’s very unique. I’m excited to announce that the Parking App Team that won last year’s DataPalooza, with roots in downtown Raleigh, has launched in North Hills.

Delivered as part of an all-encompassing app, the team has put together something that acts as the center of all North Hills information including events, shops, movies, and parking. North Hills saw value in what our team put together and has now delivered it for public consumption.

The team consists of Jim Belt, King White, Eric Majewicz, and myself, all members of the Raleigh Downtown Living Advocates. For over a year now, the team has been talking about a high-tech solution in order to address growing concerns about parking in downtown. We quickly found out, through the North Hills experience, that our solution had an application elsewhere.

It is our hope to use the experience to bring the same high-tech solution to downtown Raleigh in the near future.

The North Hills app is available for download in the Google Play Store and Apple Store.

Read more about it on the official page on the DLA site.

nh_park1

nh_park2

nh_park4

Leading Pedestrian Intervals on Fayetteville Street

Video link – Leading Pedestrian Interval in downtown Raleigh via YouTube.

Some may be noticing a slight change when walking along Fayetteville Street. Last week, I saw that some of the pedestrian walk signals were signaling the ‘Walk’ sign a few seconds before the vehicle traffic signal turned green. It’s not a lag in the system. It’s called Leading Pedestrian Interval (LPI) and it helps increase pedestrian awareness to nearby vehicles.

The quick video above shows one cycle at the intersection of Hargett and Fayetteville Streets. More are running up and down Fayetteville last I checked. There are plenty of intersections that could use this, especially along the busy McDowell and Dawson streets.

For a more in-depth look at LPI, here’s a video from Streetfilms showing them in operation in New York.

Leading Pedestrian Intervals (or LPIs) are a traffic signalization strategy that assigns pedestrians an exclusive 3 to 5 second signal (in some cases much longer) to begin crossing the street before cars get a green light. Consequently, they are also known by their sassier nickname, Pedestrian Head Start. But in my view the best variation on what LPI stands for comes from Christine Berthet of the Hells Kitchen Neighborhood Association who proposes: “Life Preserving Interval”. That’s what it is.

*LPI – Leading Pedestrian Interval

Video link – LPI – Leading Pedestrian Interval via Vimeo

It’s The [Bicycle] Network

Bike lane on Hillsborough Street.

In April 2014, Raleigh’s premier bicycle festival, Oaks and Spokes, took place. The week long event combined community rides, cycling education, and a public forum that all focused around the idea of spreading the love of cycling culture in the city. Between the fun events and public information that took place that week, I had a thought about where we are heading with regards to bicycle infrastructure.

Are we spreading ourselves too thin with mediocre (at best) bike infrastructure here in Raleigh? Are bike lanes and sharrows really spreading the cycling culture throughout our city?

In my opinion, it almost feels like the efforts we’ve made are a bit timid while a lot of other cities are really cranking up the bicycle lanes, making them protected, scenic, and comfortable to use.

I’ll pick on one of the city’s currently ongoing bicycle projects. Through a $1.1 million grant, the city will install “27 miles of marked, on-road bicycle facilities.” This project has been mentioned on the blog before and the post lists several streets in and around downtown Raleigh that will get these bicycle facilities. The rest of the city is getting some bicycle love as well so it’s important to note that this is a city-wide effort.

The project page on the city’s website has now been updated with draft plans for each street. Take a look and get your feedback to the city before May 9.

2014 Bicycle Pavement Marking Project

Click for larger

For downtown, the proposed bike facilities include bike lanes on Wilmington and Salisbury between Peace Street and MLK Boulevard. Also, sharrows will be added to Hillsborough and Cabarrus Streets under the current draft. This is just a small piece of the larger network that is being built across the city.

Dedicated lanes and sharrows might be just paint on the road but it is a step towards creating that bicycle-friendly city. Certainly there is room for improvement on what’s being installed but $1.1 million can only do so much.

Is this a quantity (coverage) versus quality (safety) situation?

Certainly more miles of “marked, on-road bicycle facilities” sounds better than less but let’s discuss an alternative approach. If you think about other forms of transit, rail lines connect major areas to each other and then over time, new lines link up to that and form a network. Highways connect cities and over time have formed their own quality network. Just like them, one mega-bicycle project could be a success in Raleigh, sacrificing total coverage but being of a much higher quality.

Instead of 27 miles of paint for bike lanes and sharrows, what if we could get 5 miles of cycle tracks and/or protected lanes? A 5 mile direct route like this could really connect places, for example:

  • It is about 5 miles along Hillsborough Street from the State Capitol to The Fairgrounds
  • In the other direction, it is less than 5 miles from the Capitol to WakeMed along New Bern Avenue
  • Glenwood South and North Hills could be connected using St. Mary’s and Lassiter Mill Road

Granted, these are highly simplistic ideas making a lot of assumptions and not taking into account a mountain of factors. However, if major connections are made between these centers of activity with high-quality bicycle facilities there may be more chances of cycle adoption, increased bicycle use in the city, and possibly giving more political backing for future projects just like it.

The Network
Mega-projects don’t just happen though. Our bicycle network, at least up until a few years ago, has been implemented from almost nothing in the city budget and some creative thinking from city planners. This includes adding bike lanes or sharrows when a road is due to be repaved, taking advantage of the need to re-stripe the street anyway.

What the city is doing to deliver our bicycle network is subtle and can be described as a slow boil. Just like the greenway network, which started being built in the 1970s, the bicycle network is being put together in any way that it can be, piece by piece.

When you look at the greenways, it is only recently that the they have really been making major connections to form that comprehensive network across the city.

Raleigh Greenway map section

So while huge projects can be fun and exciting, working towards that day when the bicycle network all comes together could be even more magical. That is one way to make Raleigh, from downtown to the outskirts, a complete bicycle friendly city.

Parking Decks and The Warehouse District

Citrix parking deck under construction

At the corner of Morgan and West Streets, the parking deck for the new Citrix offices has been rising for the past few months. The warehouse renovation into offices next door has pretty much taken shape, creating four floors for downtown’s newest, major tenant.

Any old parking deck that’s being built is usually not an interesting thing to most but this specific one has something here. It may be the elevation or the relative buildings around it but this deck just seems ominous and big.

There’s a small story here and I’m putting the pieces together each time I walk by the Citrix site. What happens when the next Citrix comes into town? Will more of these decks continue to be built?

If you look deeper behind this parking deck, you may get a glimpse into the future path that the warehouse district is on.

The Upcoming Citrix

Let’s start off by taking the focus off Citrix itself. In an interview with the N&O, Jesse Lipson, starter of ShareFile, now owned by Citrix, tells reporter Bruce Siceloff that they will have about 500 employees when they move into the building in 2014. What is not mentioned is that the parking deck will be built for about 400 cars, something you need to dive into the planning commission meetings to find out.

Citrix should be applauded for providing less car parking than employees. Their company culture encourages alternative transit and the downtown office should bump up the number of those types of commuters. They are also a web-based company and teleworking is a common practice. They are at or near the minimum number of spaces needed according to city code.

Less is More

While this behavior for our downtown sounds good, it could have been even better.

After the start of construction of its downtown site around January 2013, Citrix wanted to expand even more and made plans for an additional floor in the office component. This lead to a conversation during a certain May 28, 2013 planning commission meeting when Citrix applied for approval of that same expansion.

Citrix developers were applying for a 40,000 square foot expansion of office space, what was referred to as ‘Phase 2.’ In addition to approval, they also wanted an exemption to having to raise the number of new parking spaces that would have to go along with the new office space. More office space equals more needed parking, according to zoning.

Before the addition, Citrix was providing 341 spaces where city code required them to be at 325. With the office expansion, code would require them to raise that number to at least 400. Citrix wanted out of that and made an argument why in their presentation before the planning commission.

So to show the numbers clearly:

  • Citrix phase 1 – 341 parking spaces planned, minimum of 325 according to code.
  • Citrix phase 2 – 425 minimum needed according to code.

Here’s the 55-minute planning commission video of that presentation and followup discussion. Watch the first 24 minutes for an overview of the entire project and to get a peak at some of the amenities of the Citrix building.

Municipography – Dillon Supply Warehouse Redevelopment Phase 2 on Youtube

During the presentation, the Citrix reps state such things like:

  • Citrix runs three shifts so employees come and go 24/7, spreading the traffic out.
  • Citrix promotes alternative transit and biking with plans for a 100 space bike storage including showers.
  • 86% of employees are remote for one day of the week. This equates to about 70 people on any given day being off-site.
  • Kimley-Horn, a local engineering company, reviewed the proposal and supported Citrix’s request for a parking increase exemption. (jump to 31:35 in the video to hear their points)
  • Kimley-Horn also noted that downtown currently has a gross oversupply of parking and is facing a revenue problem.

Currently, 1 parking space per 500 square feet of office space is the code. However, a good point that the Citrix reps make is that the site will have gym and recreation spaces, a lobby, and a large auditorium. The parking count may not have to rise for these amenity spaces and if you subtract them, the actual amount of spaces needed including the new office expansion is now 329. (still below the 341 provided at this point)

This sounds like a great fit for an urban area as the parking needs are smaller than most. These are the types of places that would be great for a transitioning downtown. Employees here don’t punch a clock at 9am and 5pm, contributing to a typical morning and afternoon commute. Activity should be ongoing throughout the day and night around the Citrix offices, supporting that 24-hour downtown that supporters are trying to build.

After the presentation things started to turn.

Deferral

If you want to watch this part, jump to about 24:30 in the video.

A few commissioners expressed concern about the lack of detailed information on how many employees would be on site at a time. Without this detailed information, commissioners could not anticipate any potential problems that, if Citrix was wrong in its parking usage, would permeate out across the warehouse district in the future.

Commissioner Steve Schuster, who by the way is one of the leads at Clearscapes Design Firm and is probably an expert on the warehouse district because of their heavy involvement on Raleigh Union Station, stated, “We’re about to face a parking challenge in the warehouse district.”

Schuster’s thinking was most likely based on ongoing analysis of the entire warehouse district and how development could boom here in the near future. Schuster, with the backing of other commissioners, felt that allowing this parking reduction exemption would set a precedent for future developments here, further exacerbating the parking problem. (the upcoming challenge)

The conclusion to the meeting is that the commission motioned to defer the office expansion so that Citrix could bring back more details on employee counts. They approved the deferral. Remember, this application was for the office expansion but parking dominated the discussion instead.

Citrix reps then, right on the spot, made a move to drop the parking reduction exemption, raise the parking space count to 430 in an effort for construction to stay on schedule. This was approved and Citrix got their office expansion.

A missed Layup

While I tend to always challenge parking minimums and preach about the need to reform parking management, there is a real concern with too little parking. As city staff stated during the discussion, having too little means that cars start using spaces in nearby areas that weren’t intended to handle that kind of traffic.

If Citrix had too little parking, the thought, shared by the planning commissioners, is that nearby Boylan Heights and the rest of the warehouse district would pick up the load. The neighborhood isn’t zoned for that kind of activity so the result would be an inappropriate use of those streets.

The planning commission mentioned the precedent that could be set by allowing Citrix to be exempt from the minimum required parking. They were afraid that future developments in the warehouse districts would also want that exemption, resulting in an area that continues to struggle with the so-called “parking challenges.”

What bothers me here is the handling of the request from Citrix and how it fits into the future vision of the warehouse district and downtown as a whole. Aren’t we trying to become a little more urban? Aren’t we trying to create growth nodes, filled with density that support alternative transit? Haven’t we identified that the city has a parking oversupply and is spiraling into debt?

I felt like the commission had a perfect candidate, one that asked for a parking exemption and is compensating for it with the exact urban culture that downtown Raleigh needs. Instead, it was status quo and the future of the warehouse district is on a path for more parking decks.

I know we can’t magically turn urban in just a few years. The way to get there is to have small victories that transition us there. It takes small steps. I think more people need to realize that.

We didn’t take that step here with Citrix and the way I see it, the planning commission has now made it more costly to building in the warehouse district, threatening any preservation of the warehouses we have there, and continuing to support a car culture in a very walkable, human-scale area of downtown.

In the spirit of basketball going on now, the commission had an open lane for an easy layup but instead passed the ball for someone else to decide what to do.

Ongoing Moore Square Transit Station Study Reveals Future Plans

Buses at the Moore Square Transit Station.

Last week at a public information session, plans for Raleigh Union Station and the Downtown Bus Facilities Master Plan were shown off and discussed. While Union Station gets all the press, see the updated renderings (via N&O), plans for the Moore Square Transit Station are now unfolding. With less pizzazz, and less progress, compared to Union Station the question of how downtown will handle the hub of Raleigh’s future bus system is very important.

The problem revolves around one question. How will the rail networks serving Raleigh Union Station compliment a future expanded bus network, and vice versa? Our current Moore Square Transit Station, the central hub of the Capital Area Transit system, is nearing capacity. If it were located near Union Station, there’s still not enough room to incorporate all the future routes and riders.

What planners are trying to figure out now is how to use bus terminals at both Union Station and Moore Square so that they compliment each other effectively. During the meeting last week, I took some photos of the current thoughts on how the Moore Square Station may evolve over time.

Click on this image below to see a possible solution for the current, near future, and long-term traffic flow of Moore Square Station. Excuse the blurry cam.

Possible future plans for the Moore Square Transit Station.

The first image shows the current layout and bus flow through the station. Buses turn in to the station on Martin Street and depending on the route, they either leave on Blount or Hargett Streets.

As the system grows and Union Station is worked on, Moore Square will have to accommodate more buses and routes before Union Station can alleviate some pressure. The second image shows how that could work. The inner lane can be expanded and converted to two-way. After removing some planters and parking, there actually is room to make that expansion work. I had to go and see that for myself and sure enough…

Moore Square Transit Station

With another lane for buses, capacity is increased. At the same time, the station is pretty much maxed out.

The third image shows what the future of Moore Square Station could be once Union Station is up and running with bus routes circulating here and there. The one-way street and connection from the station to Blount can be removed, leaving only the two-way lane for buses.

There is still lots of work to do with planning routes, which stations they will serve, and how to effectively connect both Union Station and Moore Square Station. This just shows that Union Station could be one piece of a major transit network overhaul in Raleigh’s future.