The Fairweather condos are coming together and has already topped out. The building is on track to have residents move in this Summer.
According to their website, there are 8 units left out of the 45 total.
The Fairweather condos are coming together and has already topped out. The building is on track to have residents move in this Summer.
According to their website, there are 8 units left out of the 45 total.
It’s not a totally exciting photo for this week but progress is being made on The Fairweather, downtown’s newest condo building.
Condos haven’t really been springing up in DTR recently as apartments are still pretty hot. According to their website, only a few units remain. The project should be finished sometime in 2020.
The site of The Fairweather condos has been cleared at the end of Harrington Street. After the Rogers House move in June, this makes the site ready for construction of the 45 condo units. The view should be pretty nice!
The Rogers House has landed at its new home at the corner of Bloodworth and Cabarrus. It’s one of the two homes that were saved from West Street where The Fairweather, a 45-unit condo building, is planned to go. The second house, larger home, the neighbor to The Rogers House, could not be saved.
I’ll have to visit the West Street site next as crews start to work on The Fairweather. Meanwhile, the new foundation for the historic Fourth Ward house is already being put together as the renovation work is underway. It’s a good fit for the Prince Hall Historic District.
Join the discussion about this historic home and the Prince Hall Historic District on the Community.
As a compliment to a 2016 post on North West Street, today I wanted to take a look down South West Street. West Street through downtown is becoming an important corridor and from one end to the other, there are projects taking place that may make it a pretty desirable street in the future.
In case you weren’t aware, the directional prefixes for streets running north and south start at Hillsborough Street (west of the Capitol) and New Bern Avenue. (East of the Capitol) Hence, we start our walk at Hillsborough Street.
New developments and businesses are great but we always have to give a nod to the old favorites that have been threw a lot. I want to give a quick shout out to The Roast Grill, having been at this spot on 7 South West Street since 1940.
Will they make it to a hundred years? Time will tell but I certainly am pulling for them. The TBJ has an article (subscription required) that suggests they aren’t selling out. However, the pressure may rise as nearby developments take shape.
Heading towards the 100 block of South West brings us to the Morgan Street Food Hall. Food halls are a trend that’s happening around the country and Morgan Street will be our first (first, right?) food hall in recent memory. Plan for them to open this Spring.
Citrix employees should be food connoisseurs after that place opens.
The food hall will also get a nice infusion of nearby residents from the residential portion of The Dillon. Residents should be moving in this year and the developer has already landed a few restaurants and retail for the ground-floor spaces. Announced so far, we have:
And there’s plenty of space for more.
As you walk by the residential units of The Dillon along the 200 block, there’s a sharp contrast between the life that will soon pop here and the still empty warehouse building on the west side. Plans have seemed to come and go for this huge warehouse.
Another Citrix-like rehab could be a decent proposal for this site as it has a large-footprint but hopefully a more mixed-use repurpose can be done. At this time, no plans have been announced.
The end of the block approaches the office tower portion of The Dillon and Raleigh Union Station.
West and Martin Street will be a cool intersection I think. The Dillon’s 18 floors will draw activity here during the work days and the retail spaces, CAM, and Union Station will fill in the off hours a bit. I think it’ll feel lively and offer great views towards the downtown core.
Some warehouses nearby are also getting some renovation love. Father and Son’s newest location, the former Flanders Gallery, and the next-door neighbor have visible signs of upkeep.
Union Station is set to open early this year and I think you’ll see a small uptick in visitors as people from all over will come down to check it out. I remember when Fayetteville Street first opened in 2007 and on the first Sunday night after opening (when everything was closed) the street was jammed with cars filled with curiosity.
I think the same thing will happen this year.
At this point, West Street ends but my walk does not.
The city is studying plans to make West Street tunnel beneath the train tracks and connect to itself at Cabarrus Street. The street currently goes below the tracks and turns into the Union Station parking lot so some of the work is already done.
Next to Raleigh Station, you can see how the grid is still aligned and the West Street tunnel would make the grid connect.
At Cabarrus, there is the old Raleigh Station, waiting to be demolished sometime this year. The future of this property is still up in the air as Amtrak services and offices will relocate into Union Station.
The 500 block of South West transitions us from the warehouse district into a more residential area.
Condos are planned at the corner of West and Lenoir. The Fairweather plans 45-units in a five-story, modern building. Construction hasn’t started just yet but the announcement of the project claims an early 2019 opening.
Worth mentioning again, one Raleighite has an idea to save two houses on this block of West. When pitched at a city council meeting in December, the idea didn’t fly with some councilors due to the fact that he sits on the city’s planning commission.
There is a risk of losing these homes that well represent Raleigh’s former Fourth Ward neighborhood, and in addition a plan to offer some affordable housing unless something happens in the near future. Jump back to the full story on this here.
At the corner of West and Lenoir, across from the future Fairweather project, is an old gas station that is planned to be renovated for a restaurant. No work seems to be taking place on the exterior at the moment so perhaps it’s all inside work right now.
Along the 600 block of West, the townhomes called West + Lenoir are wrapping up. These are some of the earliest townhomes to be completed in this area as nearby Fourth Ward and 611 West South have not really begun yet.
West Street ends at South Street and so does our walk.
Along South, more demolition and construction is taking place as the area turns over. The South Street Market was just recently demolished and the storage facility has recently topped out.
Now that we’re familiar with West Street, I’d like to zoom out a bit. Above is a map of South West Street with highlighted locations from this post. In my opinion, the momentum behind Dix Park and downtown Raleigh put the affordable housing units of Heritage Park in the crosshairs.
I just can’t imagine the investment of over $10 million for a West Street tunnel, “bridging” just two blocks into downtown, is worth it if there was not some other driving force behind it.
When you look at it on a map, there’s no denying the temptation to push West further south, maybe even trying to connect it to Lake Wheeler. That would be a great downtown connection to Dix Park. With current politics, pushing aside Heritage Park wouldn’t be popular. However, from a strictly planning point-of-view, it’s worth a look.
I’m not advocating it. I do think there might be plans for a major road shakeup in this area in the next 3-5 years.
Either way, West Street will continue to grow and play an important role for downtown in the coming years.
A project that I highlighted here on the blog back in November 2016 is now in the presale phase. The Fairweather will be a five-story condo building with 45 total units. The location is in between downtown Raleigh and the future Dix Park. See it on Google maps here.
From the press release:
Slated to open in early 2019, The Fairweather features five stories with approximately 45 units, ranging from 838 to 2,645 square feet. The first four floors showcase one, two and three bedroom units starting in the upper $300s to the $600s, while the fifth floor offers penthouse suites for $700 to $1 million. Located at the corner of S. Harrington, Lenoir and S. West streets, The Fairweather sits on a hilltop that affords owners views in every direction of Raleigh’s skyline. The development also offers immediate walking distance to landmarks, such as Dorothea Dix Park, the new Raleigh Union Station and the Warehouse District’s upscale restaurants.
New-construction condos haven’t been seen in downtown Raleigh in awhile so it may make sense that high-end units come first. I’ve been told this will be somewhat of a more distinctive building compared to what we’ve been used to in the apartment scene.
The exterior renderings will be most interesting to see.