Green Square Construction Shows Life

Almost six months after the demolition of the old NC DOT building on McDowell St., work on the Green Square project is finally getting started. It is nothing exciting yet but it is better then a pile of dirt or a huge, vacant hole in the ground (should I give examples?). Behind a long green monster wall, it looks like foundation work is taking place at the moment.

For a recap on the project and a view of the old buildings that were here, this post is a must read.

When completed Green Square will consist of:
• Headquarters for the NC Department of Environment and Natural Resources
• The Nature Research Center, an expansion of the NC Museum of Natural Sciences
• Visitor and employee parking deck
• Retail store and restaurant

Any artists in the audience want to tag up the green wall? Something like this maybe?

RalCon Open Discussion

If you have been reading the site for awhile now, you may have noticed things being a little slow. I’ve been real busy lately but have no fear, it’s just because I have been making tons of plans. Last week alone consisted of hockey, football, birthday, and a trip to West Virginia. Hopefully I’ll be able to ramp up some new content for the blog this week.

In the mean time here are some pics for discussion, viewing, or any other shenanigans you crazies can come up with.

FAIL! I still like the coffee though.

Ugly Monkey

City Plaza Work Beginning

The groundbreaking of city plaza will be very soon and there are signs of work happening just beyond the planters that dead end Fayetteville Street’s 400 block.

Construction fencing around the area

Temporary pedestrian walkways are being put in place

The plaza will finally finish off Fayetteville Street and car traffic will freely flow from Morgan to Lenoir. The plans on the city’s website do not show any parking on this block and that will help create a lively area with pedestrians. I’m hoping that the street is also flush with the sidewalks as that will also make the area feel like it is more for foot traffic.

I find it interesting that plans for street concerts are still being considered for city plaza. Is this really needed after it is completed? I propose that concerts on Fayetteville St. be moved up one more block to what is referred to as Sites 2 and 3; the parking lots between Lenoir and South St. in front of the Performing Arts Center. Are the couple hundred spaces here really needed when, upon completion, the 1500+ spaces underneath the Marriott and Charter Square will be available soon? Do not forget the convention center parking deck and Progress Energy parking deck too.

EnviroCon: A Home For Electric Cars In DT Raleigh

Did you know that Raleigh has a small fleet of cars that run on alternative fuels? Almost a year ago it was announced that the city bought a Toyota Prius and modified it to run on only electricity. It wasn’t until recently that I was told by a friend about where this famous Raleigh Prius re-charges. It has its own space and electrical plug right on the bottom floor of the municipal parking deck on Morgan St.

The Prius was not there while I was lurking around the deck but other city vehicles were parked around it. It was interesting to see a car using natural gas as a fuel source.

Eventually one of these vehicle technologies will be adopted if gasoline ever goes away. If electricity prevails, you can see here how easy it is to upgrade parking spaces with simple electrical outlets.