
The Lincoln apartments, planning to open in Summer 2015.

The Lincoln apartments, planning to open in Summer 2015.

Construction of Peace Street Townes continues. A sign at the site claims, as of last weekend, that only 4 units remain of the 18 unit site.

I’m trying to think when the last new church was built in downtown Raleigh? There may be quite a gap between that one and the one being constructed now on Peace Street next to the AIA NC building.
Holy Trinity Anglican is currently located at the house on the corner of Peace and Blount Street next to the church construction site. The building should be finished by September 2015. There’s a nice virtual tour video, embedded below, or on Vimeo. I wish other new developments would release videos like these.
Take the Tour from David Cumbie on Vimeo.
Saw this on Twitter. This project is increasing in height it looks like.
The Edison Office in #DowntownRaleigh for @BeaconCLT pic.twitter.com/AT7A8c2F4A
— JDavis Architects (@JDavisArchitect) August 28, 2014
Last week, the Raleigh Appearance Commission got a look at some new renderings for a hotel planned for the parcel of land near 500 Salisbury Street next to the convention center between Lenoir and South Streets. Long-time readers might remember this site being called “Site 4” and it looks like the renderings are getting more mature now.
Some of the specs for the hotel, planned to be a Residence Inn, have slightly changed also. Comparing to a January 2014 post, we have:
Most is the same including the second floor and rooftop terrace.
As mentioned in past posts, this project will not add any more parking as a deal has been made between the developer and the city to lease spaces out of the Performing Arts Deck.
The project has a good human scale to it and expands downtown’s hotel offerings. I think this project is an easy one to support. While not architecturally significant, it’s more a functional addition rather than an iconic one. Looking forward to groundbreaking.

The Charter Square construction site seen from City Plaza. This is the first tower of the two-tower project.

Corner of Wilmington and Davie Streets, future site of The Edison Apartments. The two-story brick buildings have been removed and the site is cleared for new construction.
Here’s a photo of the same corner in 2008.

Concrete and steel is rising at the Charter Square site.