Here are some pictures from yesterday’s raising of RBC Plaza’s top hat. Raleigh Skyline also has some great pictures of the top hat being raised into the air.
The rest of the crown is currently going up so expect an update soon.
[UPDATE: 9:20 AM]
Piece number 2 is currently being placed. Let’s hope the weather does not interfere.
Piece #3 awaits lift off.
[UPDATE: 11:15 AM]
Piece number 3 is hanging up high.
[UPDATE: 3:30 PM]
The last piece sits at the bottom.
[UPDATE: 5:00 PM]
There you have it, all four pieces are now 500 feet in the air. Now, we wait for the final touch to RBC Plaza, the spire.
Similar Posts:
- The Rise of RBC Plaza Through Time | November 10, 2021
- Leisure Aquatic Features Coming to Downtown [UPDATE: 6-11-08] | October 28, 2024
- CON-struction and D-struction | November 10, 2021
Comments
Comments are disabled here. That's because we're all hanging out on the DTRaleigh Community, an online forum for passionate fans of the Oak City.
A milestone for our skyline, without a doubt. Sure, it is not a 60-story tower, but nevertheless a good addition. Thanks for the great photos.