Today, let’s jump over to the corner of West Johnson Street and St. Mary’s. A collection of properties is up for rezoning (Z-55-22) and we’re almost one year into it as the case still has not been denied or approved. Negotiations with residents, mostly from the nearby Forest Park neighborhood, started in May 2022 and the conditions on this rezoning are starting to get a bit much. The latest public hearing, from March 7, 2023, about the case is shown above or you can watch it directly on YouTube here.
Continue reading →Category / New Construction
Pic of the Week

The site of the future Raleigh Union Station Bus Facility, or RUS Bus, is looking fresh as the final portions of the former warehouses have been removed. A subset of the walls from the old warehouses were saved and will be incorporated into the new building. You can see them at the corner of West and Hargett as well as the corner facing the Union Station plaza.
Continue reading →Checking in on the Apartments at Platform and West End

West Cabarrus Street is getting a big shot of residents with more apartment projects. We’ve been tracking The Platform, shown above, and later this year, we should have another project break ground, West End II. That’s about 440 (Platform) plus 240 (West End) equals 680 homes for the area in the coming years.
Continue reading →Pic of the Week

400H has been getting all dressed up lately. The glass tower at 400 Hillsborough Street definitely looms over the street as you get into town and cross the bridge. The mixed-use project looks to be topped out and I imagine soon the tower crane will come down as workers add the finishing touches.
Continue reading →Kindley Street Getting in on the Upzoning Action and Mira Raleigh Apartments Under Construction
Kindley Street is not mentioned all that much in the news. Mainly because it is a dead-end street that branches off Salisbury Street. In this section of downtown, there have been one-story, suburban style office buildings probably since the 1980s. (or even earlier) That dynamic is already starting to change.
Zooming in, I am mostly talking about some land that is southwest of the train tracks crossing Kindley Street. A collection of properties have been acquired and there is a new rezoning on the table to raise the height limit from the current 20 stories up to 40 stories. In addition, construction of a building with 288 apartments is already taking place. Finally, we may see Kindley Street connect to Martin Luther King Jr Blvd in the future.

You can see the site in the google map aerial above, highlighted in orange. Again, it’s probably not an area most go to as Kindley dead ends and there isn’t much there to begin with. (more so now after all the recent demolition nearby)
A new apartment building, named Mira Raleigh, is already constructing some future homes. It’s a tough location to photograph but you may have seen the building come up if driving down MLK. Here’s one photo, in addition to others, on the Community.

Rezoning case Z-088-22 has a majority of the property wanting to go taller. What’s also interesting is a separate subdivision case that may connect Kindley Street to MLK. The way I’m reading things, it actually looks like they own the northbound ramp from MLK to McDowell Street so I feel this may be removed if this new street configuration is put in place. I’m sure an alternate route will be put in place.

The rezoning case is still in the early stages and has yet to go before the planning commission. I’d like to think this is an easier rezoning to approve as no existing structures are impacted, there’s no traffic increase for anyone to complain about, and the location is very close to the downtown core.
If interested in this area, make sure to also check out nearby Salisbury Square.
Pic of the Week

Freedom Park has it’s signature piece installed. Work has been a bit slow but that can’t come to a surprise to anyone with the state of construction these days. A lot of earth moving has taken place since we’ve last checked in with the site and today you can see the outline of the walkways. The retaining wall edges of the walkway and plazas are somewhat in place also.
Get to know more about the project right here.
Pic of the Week

A set of townhomes that have been under construction all year are starting to look real good along South West Street. Dukes at Cityview are offering eight units at the corner of West and Lenoir.
These amenity-rich units are being sold on the higher end of the spectrum but offer quite a lot in addition to being at a great location. As of this post, their site shows four units sold already. Take a look for yourself.
Checking in on Seaboard Station

Good or bad, depending on how you see it, Seaboard Station is transforming right now. The construction energy is high and personally, I’m just thrilled to watch it take place. If you stop by on a weekday, it feels like every corner has construction workers moving and building. Numerous vehicles and machines are churning out materials. The hum and pure noise of the site suggests someone has the pedal to the floor here.
This is what top to bottom change looks, sounds, and feels like.
Now don’t get me wrong, I was more or less fine with the former Seaboard Station buildings. They had a nice warehouse, brick feel to them and a great collection of local businesses made their homes there. However, we’re seeing a complete transition from a suburban retail district into an urban one. That is pretty exciting to me.


The apartment building, called The Signal, on Block B (reminder of the blocks here) looks pretty good from the outside and the finishing touches are being applied now. Residents should be moving in around Spring 2023. The sidewalks are looking great (nice and wide) and when small businesses set up shop here, it’ll be on a completely urban dynamic that the retail district never had before.
Block A is starting to rise out of the hole they dug out at the corner of Peace and Halifax. More apartments and a hotel are being constructed on this block and it was announced recently that the hotel will be a Hyatt House hotel with a rooftop bar called High Rail.

Block C is the youngest site to get started but a crane is already up and work is humming along. At this pace, it won’t take long before this one goes vertical as well. You can take a look at the panorama shot at the top of this post for a peek at the site.
That’s it for the active work at Seaboard at this time. In the future, we’ll have work taking place at Logan’s after the long-time business moves out. Current plans look to move the Seaboard Station building further north and build a pair of towers at 16 and 20 stories. More on that in a future post.
I’m excited for it all and for a more urban Raleigh on downtown’s north side.