As the weather cools down and the leaves start to fall, Moore Square becomes a little clearer to see between the trees and the fencing. I thought it would be a good time to take a walk around the square as we wait for it to reopen sometime early in the new year.
Three major things jump out at as you look around the square. There’s a huge lawn in the middle, the sidewalks are being greatly improved, and the cafe/restroom structure is starting to take shape.
The grass has been put down for the big lawn and the walking paths around it are being put together. The lawn has a slight slope to it which makes it great for laying around or possibly sitting for a small show if a stage is set up at the bottom. This may make the square feel much bigger than it was before.
The sidewalks have been completely overhauled. The corners of the square are spacious with bulb-out sidewalks The angled-parking that used to be along Martin Street is now gone and the sidewalk is being poured over this, making this end of the square feel much larger. Bulb-outs also exist for some of the crosswalks which makes crossing the street much easier.
The cafe and restrooms are coming together and the faux-stone siding is starting to be installed. The architecture around this should be high-quality and already it looks great. From a distance, it looks like a gathering place that should draw people into the park.
It’s exciting to see the square come together and the timing seems good to have it open before Spring 2019. Fingers crossed!
Similar Posts:
- Moore Square Redesign Public Workshop Tomorrow | January 5, 2013
- Waiting For Moore Square’s Latest Makeover | October 28, 2024
- Moore Square Redesign Chugs Along Towards Construction | November 10, 2021
Comments
Comments are disabled here. That's because we're all hanging out on the DTRaleigh Community, an online forum for passionate fans of the Oak City.